Odd railway gauges
Title: Odd railway gauges
Category: /Literature/English
Details: Words: 337 | Pages: 1 (approximately 235 words/page)
Odd railway gauges
Category: /Literature/English
Details: Words: 337 | Pages: 1 (approximately 235 words/page)
showed first 75 words of 337 total
You are viewing only a small portion of the paper.
Please login or register to access the full copy.
Please login or register to access the full copy.
showed last 75 words of 337 total
boosters (SRBs). Made by Thiokol in Utah, these SRBs had to be shipped to the launch site via the railway. During its travel to the launch site, the railway ran through a tunnel encompassed by mountains. Because the SRBs had to go through the tunnel and the tunnel is only slightly larger than the width of the railway, the designers of the SRBs had to make them a little smaller than what they had wanted.
